Ocean Lakes Elementary School

 

Key details

Renovation

Net-zero energy consumption: 0.1 EUI for 2022

 
 
 

Project Highlights

  • First net-zero energy school in the Virginia Beach Public School system, the second net-zero energy building in the area after the Brock Center and the first net-zero energy public building renovation in the State to achieve this status.

  • Design and construction were separated into two phases: Phase I included the window replacement, geothermal well field installation and classroom heat pump installation. Phase II included the replacement of the existing air-cooled rooftop units serving common spaces with water source heat pumps.

  • Mechanical system utilizes a geothermal water source heat pump (WSHP) configuration to condition the classrooms and larger spaces like the cafeteria, gymnasium, and library.

  • Administration spaces are cooled by a highly efficient air-cooled variable refrigerant flow (VRF) system while the geothermal system operates at minimum capacity during the summer.

 
 

Energy Data

2013 2014 2015 2016 2017 2018 2019 2020 2021

2022

2023
Site EUI (k-Btu/ft² • yr) 60.9 58.5 52.8 47.4 42.7 30.1 27.5 22.1 18.3

0.1

1.5
Annual Electric Bill (from Dominion Energy) ($) $112,636.07 $105,275.78 $95,593.57 $88,540.09 $79,570.99 $58,282.19 $55,369.72 $44,749.08 $35,985.69

$254.11

$3,954.12
 
 

TEAM + SPECIFICS

  • Phase I Completion Date: 2017

    • Mechanical Contractor: D.E. Kirby

    • Cost: $3,154,000

  • Phase II Completion Date: 2021

    • Mechanical Contractor: NORESCO

    • General Contractor: JRC Mechanical

    • Cost: $1,180,000

  • 600 student capacity

  • 69,000 SF

 
Previous
Previous

York-Poquoson Sheriff’s Office

Next
Next

Midlothian Library