Midlothian Library
Project Highlights
Provisions for rooftop solar panel array projected to provide nearly 100% of the building’s annual energy consumption
Rooftop air-cooled chiller serving air handling unit located in the mechanical room
Fan-powered variable air volume (VAV) boxes regulate each temperature zone
300KW diesel generator for standby power
Renewable construction materials
Interactive outdoor learning classroom
Dedicated study spaces
Large community meeting room
TEAM + SPECIFICS
Opened in January 2024
Architect – HBA Architecture & Interior Design
Contractor – Loughridge & Company, LLC
25,000 SF
$14,000,000 total cost