Princess Anne Middle School

 

Key details

New construction

Architect-led team

LEED Certification pending

 
 
 

Project Highlights

  • HRACRE Excellence in Development Design Award

  • Designed to achieve LEED Certification - designed to use 36% less energy than the energy code requires

  • Efficient HVAC system, including water source heat pumps coupled to 728 geothermal wells

  • 2,600+ roof-mounted solar panels supply over 50% of the school’s energy needs

  • Rainwater is captured and used for flushing toilets

  • Plumbing fixtures use 32% less water

  • Building interior spaces are daylit, and all lighting fixtures are LED

  • Energy Star Design Score of 91

 
 
 
 

TEAM + SPECIFICS

  • Opened in 2021

  • Architect – RRMM Architects

  • Contractor – McKenzie Construction Company

  • Structural Engineer – Speight Marshall Francis

  • Civil Engineer – Kimley Horn and Associates

  • Landscape Architect – WPL Site Design

  • 257,784 SF

  • $65,000,000 total cost

 
 
Previous
Previous

E.W. Chittum Elementary School

Next
Next

Chesterfield County Midlothian Fire Station #5